š Case Study
Texas ERCOT West Texas Wind Cluster Stability Upgrade
Repeated voltage collapse during summer peak load + low-wind conditions
šļø Project Overview
3 GW wind farm cluster connected via 345 kV weak line (SCR ā 1.8)
šÆ Challenge
Repeated voltage collapse during summer peak load + low-wind conditions
š§ Design Approach
Deployment of 4Ć 150 Mvar STATCOMs with dynamic reactive power scheduling and Q-V droop tuning
š Key Calculations
Q-V Droop Setting
ĪQ = k Ć ĪV
Result: k = ā300 Mvar/pu
Prevents reactive power starvation during voltage sag
Voltage Stability Margin
VSM = (V_critical ā V_operating)/V_critical
Result: 0.14 pu
Below 0.15 pu threshold requiring mitigation
š Results
Zero voltage collapse events over 24 months; improved recovery time from 4.2 s to 0.8 s post-faultš” Lessons Learned
- ā¢Q-V droop must be coordinated across all reactive support devices
- ā¢STATCOM placement requires modal participation factor analysis
ā Key Takeaways
- 1Q-V droop must be coordinated across all reactive support devices
- 2STATCOM placement requires modal participation factor analysis