šŸ—ļø Project Overview

3 GW wind farm cluster connected via 345 kV weak line (SCR ā‰ˆ 1.8)

šŸŽÆ Challenge

Repeated voltage collapse during summer peak load + low-wind conditions

šŸ”§ Design Approach

Deployment of 4Ɨ 150 Mvar STATCOMs with dynamic reactive power scheduling and Q-V droop tuning

šŸ“ Key Calculations

Q-V Droop Setting

Ī”Q = k Ɨ Ī”V
Result: k = āˆ’300 Mvar/pu
Prevents reactive power starvation during voltage sag

Voltage Stability Margin

VSM = (V_critical āˆ’ V_operating)/V_critical
Result: 0.14 pu
Below 0.15 pu threshold requiring mitigation

šŸ“Š Results

Zero voltage collapse events over 24 months; improved recovery time from 4.2 s to 0.8 s post-fault

šŸ’” Lessons Learned

  • •Q-V droop must be coordinated across all reactive support devices
  • •STATCOM placement requires modal participation factor analysis

āœ… Key Takeaways

  • 1Q-V droop must be coordinated across all reactive support devices
  • 2STATCOM placement requires modal participation factor analysis