FERC Order 2222 Interconnection Checklist v2.1 (Excel)
FERC Order 2222 Interconnection Checklist v2.1 (Excel) is a standardized, spreadsheet-based tool developed to guide stakeholders—such as DER aggregators, interconnection applicants, and utilities—through the technical, procedural, and regulatory requirements for interconnecting distributed energy resource (DER) aggregations under FERC Order No. 2222. It operationalizes the rule’s mandate that RTOs/ISOs remove barriers to DER aggregation by standardizing interconnection processes across jurisdictional boundaries. The checklist serves as both a compliance aid and a collaborative workflow document supporting transparency, consistency, and auditability in interconnection studies and agreements.
📖 Overview
📑 Key Components
🎯 Applications
- ✓ Pre-submission gap analysis for DER aggregator interconnection applications
- ✓ RTO/ISO internal process alignment and staff training
- ✓ Third-party due diligence for financing or M&A of DER portfolios
📐 Key Formulas
Aggregation Capacity Threshold Validation
SUM(Individual DER Nameplate Ratings) × Aggregation Derating Factor ≤ Interconnection Voltage Level Max Capacity
Verifies whether the proposed DER aggregation complies with the maximum allowable capacity limit at its point of interconnection, applying site-specific derating factors for intermittency, location, and control latency.
Telemetry Latency Budget Allocation
Total Allowable Latency = Control Signal Propagation + Device Response Time + Cybersecurity Processing Overhead ≤ 100 ms (per FERC Order 2222 Annex B)
Calculates end-to-end communication latency budget to ensure real-time dispatch compliance for aggregated DERs participating in regulation or contingency reserves.