📋 Case Study

Offshore Wind-to-Hydrogen Hub: Hywind Tampen Integration

Intermittent power supply, marine corrosion, space-constrained platform layout

🏗️ Project Overview

Integration of 1.5 MW PEM electrolyzer with floating wind farm off Norway

🎯 Challenge

Intermittent power supply, marine corrosion, space-constrained platform layout

🔧 Design Approach

Modular skid-mounted PEM system with seawater-cooled thermal management; dynamic load-following control; IP66/NEMA 4X enclosures

📐 Key Calculations

Wind-Derived Load Factor

Actual H₂ Output / Theoretical Max Output
Result: 62%
Drives stack oversizing requirement

Corrosion Allowance Thickness

ISO 12944 C5-M coating + 1.5 mm SS cladding
Result: 2.8 mm
Ensures 25-year marine service life

📊 Results

92% grid-independent operation; 0.8 kg H₂/kWh LHV efficiency; certified ATEX Zone 1 compliant

💡 Lessons Learned

  • Marine-grade materials non-negotiable
  • Dynamic ramp rates must match turbine inertia
  • Redundant cathodic protection required

Key Takeaways

  • 1Marine-grade materials non-negotiable
  • 2Dynamic ramp rates must match turbine inertia
  • 3Redundant cathodic protection required