IEEE 1547.4-2023 DER Aggregator Conformance Test Plan (PDF)
IEEE 1547.4-2023 is a standard that defines the architecture, functional requirements, and conformance test methodology for Distributed Energy Resource (DER) Aggregators—entities that coordinate multiple DERs (e.g., solar PV, batteries, EVs) to provide grid-support services. The Conformance Test Plan (CTP) is a normative annex specifying test procedures, pass/fail criteria, and verification methods to ensure aggregators comply with IEEE 1547.4-2023’s interoperability, control, communication, and safety requirements. It serves as the authoritative technical basis for third-party certification and regulatory acceptance of DER aggregation systems.
📖 Overview
📑 Key Components
🎯 Applications
- ✓ Third-party certification of commercial DER aggregator platforms
- ✓ Regulatory approval for aggregator participation in ISO/RTO markets
- ✓ Interoperability validation during utility-scale DER fleet integration
📐 Key Formulas
Aggregated Resource Response Time
T_response = max(T_control_delay, T_comm_latency) + T_DER_activation
Maximum time from grid operator command issuance to full aggregated resource response, used to verify compliance with Section 6.3.2 timing requirements
Constraint Violation Rate (CVR)
CVR = (N_violations / N_total_dispatch_events) × 100%
Quantifies percentage of dispatch events where aggregated output violates operational constraints (e.g., voltage, ramp rate), required to be ≤ 0.5% per Clause 7.4.1