Sierra Nevada Wind Farm Decommissioning & Sagebrush Reintroduction

Sage-grouse habitat fragmentation and soil compaction from legacy access roads

🏗️ Project Overview

12-turbine repowering project in Mono County, CA

🎯 Challenge

Sage-grouse habitat fragmentation and soil compaction from legacy access roads

🔧 Design Approach

Phased removal with on-site blade shredding; native Artemisia tridentata seed bank integration and micro-topographic contouring

📐 Key Calculations

Habitat Connectivity Index (HCI)

(Core Habitat Area × Corridor Width) / Total Fragmentation Length
Result: 7.2
Target >6.5 for viable sage-grouse movement

Soil Bulk Density Reduction Target

Pre-remediation BD − Post-remediation BD
Result: 0.45 g/cm³
Restores infiltration capacity to pre-construction levels

📊 Results

92% native plant cover at 24 months; 37% increase in avian biodiversity index; $1.2M avoided off-site disposal costs

💡 Lessons Learned

  • On-site mechanical blade processing eliminated transport emissions
  • Micro-contouring reduced erosion by 68%
  • Seed banking required 18-month lead time

Key Takeaways

  • 1On-site mechanical blade processing eliminated transport emissions
  • 2Micro-contouring reduced erosion by 68%
  • 3Seed banking required 18-month lead time